Role Required:
Static Overlay Admin (Bucket Role)
What's in this article:
How to add a new Static Overlay
How to remove an existing Static Overlay
How to upload a new revision with an existing Static Overlay
Static Overlays enable teams to retain and track temporary changes of assets using static overlays while allowing updates of permanent changes on the same drawing, thus supporting concurrent engineering practices and easier collaboration.
This function allows a user to annotate drawings without going through a workflow and have those annotations displayed on the current and all future revisions of that drawing until the annotation is removed.
FAQs
1. Do Static Overlays have an approval process?
No Static Overlays are intended to be an easy-to-access tool given to trained users in an operational setting where adding or removing such data should be seamless and fast.
2. Who can add Static Overlays?
Any bucket user with the Manage Static Overlay Admin role and access to the artefacts would be able to add Static Overlays.
3. Who can remove Static Overlays?
Any bucket user with the Manage Static Overlay Admin role and access to the artefacts would be able to delete existing Static Overlays.
4. Can a user remove Static Overlays added by someone else?
Yes, users would be able to remove Static Overlays added by someone else.
5. Is this available on Mobile?
Adding or Removing Static Overlays is available on WebApp only. Viewing Static Overlays is accessible via Mobile devices.
6. How can I enable Static Overlays for my organisations?
Contact your Customer Sucess Manages or contact RedEye Support.
How to add a new Static Overlay
-
Open the Artefact
-
From the Tools menu, select Manage Static Overlay
This will open the Markup Tool in Static Overlay mode with the additional slide-out menu in top right to show Overlays or other Markup Layers.
-
Apply the changes to the drawing as required using the standard markup tool functionality. This could include one or more markups such as shapes, stamps, symbols.
-
Once you have completed your changes click Submit, add your comments in the dialog box and click Submit to finish.
This will create the Static Overlay, update the artefact preview with the changes and add a record to History.
-
Repeat Steps 1 to 4 to add more overlays, this will add another record to the history for the newly added Static Overlay.
How to remove an existing Static Overlay
-
Open the Artefact
-
From the Tools menu, select Manage Static Overlay
-
Open the Overlays list. You can do this by clicking on the toggle menu in the top right or clicking on one of the markup components.
-
Click the bin button for the layer you want to delete. Confirm you want to proceed to delete.
-
Click close to go back to the Artefact details page.
Note: Do not click Submit after deleting unless you want to create a new Static Overlay with new markup. -
The Artefact History will have a new event for Static Overlay removed.
How to upload a new revision with an existing Static Overlay
The Static Overlay does not interfere with existing DMS functions including the upload or check-in of a new drawing revision.
The Static Overlays will continue to display after the new revision is uploaded.
-
To upload a new revision use the existing DMS workflows or fast draft.
-
After a new revision is uploaded to an artefact the Static Overlay will remain in the same location.
-
The Static Overlay will remain on the drawing until removed.
Comments
0 comments
Article is closed for comments.